NASA accelerates lander designs for 2028 Moon landing missions
NASA and its lander partners Blue Origin and SpaceX changed both concepts of operations on 23 October 2026 to reach a crewed lunar landing in 2028.
Photo: NASAKey points
NASA and its two lander partners changed their concepts of operations to accelerate a crewed lunar landing in 2028.
NASA and its commercial human landing system providers Blue Origin and SpaceX streamlined lander designs and changed both concepts of operations for future crewed landers, the agency announced on 23 October 2026. The changes aim to accelerate development toward a crewed lunar landing in 2028, when American astronauts are to return to the lunar surface.
The revisions matter because NASA has redefined the sequence of Artemis missions to reach the surface sooner. Artemis III is now a demonstration of rendezvous and docking in low Earth orbit rather than a landing, while the companies develop crew and cargo lander versions for near-term missions. This separates the risky orbital tests from the landing itself.
What the design changes do
To accelerate development toward a 2028 landing, the Artemis landers and Orion will no longer rendezvous in a near-rectilinear halo orbit around the Moon. Instead they will meet in an orbit that differs for each partner, informed by each company's systems. NASA Administrator Jared Isaacman said NASA is executing President Trump's National Space Policy to return astronauts in 2028 and establish a Moon Base.
Both companies must fly an uncrewed demonstration mission with their crewed landers before any crewed Artemis mission, and NASA will certify the systems beforehand. SpaceX plans in-space propellant aggregation: tanker Starships will fuel a depot Starship in low Earth orbit, which then fuels the lander. Propellant aggregation lets NASA flex the SLS crew launch timing.
Under revised operations, Starship HLS will wait for Orion and its crew in Earth orbit, dock there, then perform a trans-lunar injection burn to send the combined stack to low lunar orbit. NASA is modifying Orion so Starship can push it to the Moon. This lowers the propellant Starship must aggregate and shortens the trip back to Orion.
How each lander reaches the Moon
Blue Origin will defer propellant transfer and use three transfer stages to send the Blue Moon Mark 2 Alpha Lander, built on existing Mark 1 and Mark 2 hardware. The stack launches to low Earth orbit, then departs for an elliptical polar orbit around the Moon, with each stage separating as its propellant depletes. Compared with the near-rectilinear halo orbit, this offers faster returns to Orion, lower propellant needs, and better use of SLS performance.
Artemis III, launching in 2027, will send astronauts Randy Bresnik, Frank Rubio, Andre Douglas and ESA astronaut Luca Parmitano aboard Orion into low Earth orbit for a planned 14-day mission. Blue Origin will launch a Blue Moon Mark 2 test article into a circular low Earth orbit about 273 miles above Earth, where it can stay up to 30 days.
What Artemis III will test first
Orion will launch on SLS from Kennedy Space Center days after the Blue Moon test article is confirmed healthy. Orion first enters an elliptical Earth orbit of 18 x 1122 miles, then moves to a circular orbit at about 345 miles for thermal stabilization before rendezvousing with the Blue Moon test article. Astronauts will spend about two days evaluating its cabin, controls and life-support systems.
After undocking, Orion will reposition for a second rendezvous: SpaceX will launch a Starship Version 3 test article from Florida later in the mission, since Starship has a shorter on-orbit lifetime. Starship will enter a lower orbit at 206 nautical miles, optimized for communications coverage, and carries an added docking system at its forward end.
NASA will keep its options open before choosing between SpaceX and Blue Origin for the Artemis IV lunar lander, according to officials. Isaacman said the new space race against China will be much closer than it needed to be because of slow going in past years, but NASA is accelerating its pace. His update came six months after the Artemis II flight around the Moon.
The Moon Base near the lunar south pole should see its first launch by year's end, Isaacman said, with a Pittsburgh company attempting a second lunar landing mission after its first fizzled in 2024, aiming for the south polar region with a rover. Initial moonwalkers will wear a lighter sortie suit; Axiom Space will test it on the International Space Station next year.
Artemis IV remains scheduled for 2028 as NASA's first crewed Moon landing since Apollo, with both landers to launch next summer for docking practice by three NASA astronauts and one Italian aboard Orion. The mission requires three launches in quick succession from Cape Canaveral, docking first with Blue Origin's lander about 270 miles above Earth, then with Starship in a slightly lower orbit.
Frequently asked questions
What did NASA announce about the 2028 Moon landers?
On 23 October 2026, NASA said it and providers Blue Origin and SpaceX streamlined lander designs and changed both concepts of operations to accelerate a crewed lunar landing in 2028. Landers will now meet Orion in an orbit that differs for each partner instead of a near-rectilinear halo orbit.
What will Artemis III test before astronauts land on the Moon?
Launching in 2027, Artemis III sends four astronauts to low Earth orbit for a planned 14-day mission to rendezvous and dock with test articles of the Blue Moon Mark 2 and Starship landers, practicing procedures needed before landings near the Moon's South Pole in 2028.
How will the Blue Moon and Starship landers reach the Moon?
Blue Origin will defer propellant transfer and use three transfer stages to send the Blue Moon Mark 2 to an elliptical polar orbit. SpaceX will refuel Starship in low Earth orbit via tanker and depot ships, then use a trans-lunar injection burn to reach low lunar orbit.


